text.skipToContent text.skipToNavigation

Search Results for "{0}"

Are you looking for product listings related to:

Your local authorized Swagelok sales and service center may have additional options.

You're Filtering By:
  • Engineering Services
Clear All Filters
Filter By:
Safe Product Selection

The complete catalog contents must be reviewed to ensure that the system designer and user make a safe product selection. When selecting products, the total system design must be considered to ensure safe, trouble-free performance. Function, material compatibility, adequate ratings, proper installation, operation, and maintenance are the responsibilities of the system designer and user.

⚠ Warning: Do not mix/interchange Swagelok two-ferrule tube-fitting end connection components (or other products not governed by industrial design standards) with those of other manufacturers.

  • API Plan 22 Cooled Flush with Strainer

    API Plan 22 adds a strainer to Plan 21. Flow is routed from the discharge side of the pump, through a strainer, an orifice, and a cooler before being returned to the seal chamber. The addition of pressure gauges on either side of the strainer allows the strainer to be monitored for servicing. In dry...

  • API Plan 23 Cooled Flush, Recirculated through Seal Chamber

    < Back to Process Side Plans API Plan 23 utilizes a circulation device, typically a pumping ring, to route the fluid from the seal chamber through a cooler before returning the cooled fluid to the seal chamber. A throat bushing isolates the cooled seal chamber flush fluid from the hotter pumped li...

  • API Plan 31 Flush with Cyclone Separator

    API Plan 31 is used to remove solids from the flush stream by incorporating a cyclone separator into the flush tubing. Flow is routed from the discharge side of the pump through the cyclone separator. Clean flush fluid leaving the separator is routed to the seal chamber while fluid containing the so...

  • API Plan 41 Cooled Flush with Cyclone Separator

    API Plan 41 is a cooled version of Plan 31. Solids are removed from the flush fluid by incorporating a cyclone separator. Flow is routed from the discharge side of the pump through the cyclone separator. Clean flush fluid leaving the separator is routed through a cooler before being returned to the ...

  • Mechanical Seal Design Principles & Basics

    Better by Design: Swagelok Seal Support Systems Swagelok leverages deep fluid system expertise to design and construct simple-to-configure, easy-to-maintain,and safe-to-operate seal support systems. If you are tasked with keeping rotating equipmentonline and operating efficiently, you will find tha...

  • Training

    Expand Your Knowledge with Training by Industry Experts Swagelok ® training programs provide a range of valuable and practical tools for meeting day-to-day challenges related to fluid system and sampling system design, operation, and maintenance. In-depth, hands-on courses taught by experienced in...

  • Swagelok Essentials

    Essential Training in Fluid System Fundamentals Swagelok ®  Essentials training courses provide critical skills for developing, building, and maintaining dependable fluid systems. Taught by Swagelok-certified trainers at locations and times convenient to you, these courses provide the foundational ...

  • Process Analyzer Sampling System (PASS) Subsystem

    Process Analyzer Sampling System Subsystems Training Swagelok ®  Process Analyzer Sampling System (PASS) Subsystem training courses will teach you how to sharpen your sampling system design skills. Develop an understanding of complex system subassemblies for process analyzer sampling systems, then ...

  • API Plan 55 Buffer Fluid Circulated by External System

    API Plan 55 is a custom engineered system that delivers an unpressurized buffer fluid to the seal chamber. The buffer liquid is circulated to and from the seal chamber via a pump located on an external reservoir. A Plan 55 can contain filters, coolers, and other components that are selected accordin...

  • API Plan 75 Condensing Leakage Collection

    < Back to Between Seal Plans API Plan 75 collects leakage from the inboard seal in applications where normal process fluid leakage can condense between the seals at ambient temperatures. In this arrangement, a reservoir is connected to the containment seal drain port on the gland. Condensed leakag...

This process may take several minutes. Please be patient and remain on the page.