text.skipToContent text.skipToNavigation

Search Results for "discover"

Your local authorized Swagelok sales and service center may have additional options.

You're Filtering By:
Filter By:
Safe Product Selection

The complete catalog contents must be reviewed to ensure that the system designer and user make a safe product selection. When selecting products, the total system design must be considered to ensure safe, trouble-free performance. Function, material compatibility, adequate ratings, proper installation, operation, and maintenance are the responsibilities of the system designer and user.

⚠ Warning: Do not mix/interchange Swagelok two-ferrule tube-fitting end connection components (or other products not governed by industrial design standards) with those of other manufacturers.

  • How to Avoid FPSO Vessel Fluid System Construction Issues

    Tackling the Complexities of Floating Production Storage and Offloading (FPSO) Construction Tommy Jamail, Senior Regional Construction Manager, Asia Pacific Barry Rowe-Platts, Technical Lead, Engineering Services As members of the oil and gas industry have sought to maintain profitable upstream op...

  • Improving Operations with JIP33 Gas Fitting Standards

    How the JIP33 Tube Fitting Specification Improves Oil and Gas Operations Logan Boatright, Senior Global Account Manager, Swagelok  Imagine this: A major oil and gas operator was commissioning a topside module with more than 2,000 small-bore tube fitting connections. They selected a supplier that ...

  • How Two Major Refineries Solved Gasoline Blending Challenges

    Saving Millions of Dollars by Reducing Gasoline Blending Costs For refiners of finished gasoline and diesel fuels, ensuring that the final product meets anticipated specifications is critical. The gasoline blending process, where fuels are blended with octane to meet differing performance tiers, pl...

  • Hydrogen, Sampling, and Corrosion Insights

    The Questions We Answered in Year One of "Ask Swagelok." This past year, we were excited to introduce a new video series called “Ask Swagelok,” where Swagelok experts answer key questions and offer insights into all things fluid systems design. To date, we have published five different conversation...

  • How Scania Stays at the Forefront of CNG Bus, Refueling Station Technology

    How Scania Stays at the Forefront of CNG Bus, Refueling Station Technology The streets of Madrid, Spain, are becoming quieter and cleaner—partially in thanks to Scania, a major vehicle manufacturer that provides city buses powered by compressed natural gas  (CNG) to EMT Madrid, the biggest transpor...

  • Swagelok Field Engineer Services: Improving Analytical Instrumentation

    Swagelok Field Engineer Services: Improving Analytical Instrumentation Mike Frost, Field Engineer Worldwide, plants and facilities across every industry are facing the same pressures—decreasing manpower, increasing safety regulations, and an overall loss of fluid system knowledge. The ever-widenin...

  • 4 Strategies to Maximize Industrial Fluid System Efficiencies

    4 Strategies to Maximize Industrial Fluid System Efficiencies Cory Cottrill You have a lot of responsibilities—running your plant safely and efficiently, maximizing throughput, reducing costs, and avoiding downtime. Like most plant managers and engineers, you may not have all the resources you nee...

  • The 5 Most Common Revelations Experienced in Process Analyzer System Training: A 50 Year Retrospective

    The 5 Most Common Revelations Experienced in Process Analyzer System Training Tony Waters, Sampling System Expert, Instructor A process analyzer sampling system is one of the most challenging systems within your plant. Not only is it challenging to design, it’s also challenging to operate accurate...

  • How to Use a Regulator to Reduce Time Delay in an Analytical Instrumentation System

    How to Use a Regulator to Reduce Time Delay in an Analytical System Mike Strobel, Field Engineering Supervisor Process measurements are instantaneous, but analyzer responses never are. From the tap to the analyzer, there is always a time delay. Unfortunately, this delay is often underestimated or ...

  • Small Footprint, Big Potential: How Improved ALD Valves Will Catalyze Semiconductor Success

    One New Valve. Three Reasons It Could Change Semiconductor Manufacturing. Matt Ferraro The semiconductor market is not an easy one to navigate. Semiconductor wafer fabricators are under constant pressure to maintain maximum precision in highly complex processes that involve expensive materials, co...

This process may take several minutes. Please be patient and remain on the page.